SECURING OF THE STABILITY OF THE ACCESS ROAD

We delivered the system Erdox Terra for the securing of the local stability of the acces road in the landslide area Kraľovany. Originally, the acess road was built for the motorway D1 Turany-Hubová, (km 4,7-6,4) in the „valley“ variant V1. This variant V1 was stopped. The acess road is currently used by teh Kraľovany municipality for the agricultural purposes. There was the risk of slope deformations in the most critical part of access road in km 5,31-5,41, which prevent to use of road. This situation led to the design and implementation of remediation works in the form of stabilization with the steel units Erdox Terra.