The seminar with international participation "REHABILITATION OF ROAD NETWORK” will take place on 14-16 November 2017 in the Low Tatras. We are looking forward to meet you. -
Project Rehabilitation of the rock cliff Strečno
- 11. September 2017
- Posted by: Brano Prelovsky
- Category: Novinky, Uncategorized
The last cable anchor for the rehabilitation of the overhang under the Strečno is drilled. The works continue with the concreting of pillars under the overhangs. At the pillar A (from Martin) the second phase is being concreted. At the pillar B (from Žilina), there is preparation of formworks for concreting of the third phase. -
Terminal Intermodal Transport Lužianky pri Nitre
- 28. August 2017
- Posted by: Brano Prelovsky
- Category: Novinky
The terminal will have six tracks, two of which are 750 meters long and four of them are 700 meters long. The project also includes a reinforced area for the storage of goods and the construction of a new connecting line from the railway station Lužianka, which is connected to the remaining part of the -
D1 Bratislava – Trnava – crossing Blatné
- 28. August 2017
- Posted by: Brano Prelovsky
- Category: Novinky, Uncategorized
Nonwoven geotextile (500 g / m2) was used as a separating layer under a new cement-concrete pathway. The total area of the geotextile was 51,000 m2. Cement-concrete pavement is realized by EUROVIA. -
STREČNO – removal of unstable rock block
- 26. July 2017
- Posted by: Brano Prelovsky
- Category: Novinky
We participate on this project in cooperation with the company ARCADIS CZ a.s. The goal of the project is to remove an unstable rock block under the Strecno Castle. This implementation has no connection with the project “Rehabilitation of the rock cliff Strečno” that have been carried out since the beginning of 2017. Following an -
The PPP project Bratislava bypass D4R7
- 21. July 2017
- Posted by: Brano Prelovsky
- Category: Novinky
In cooperation with the company DOPRAVOPROJEKT a.s. We provide consultancy on geotechnical problems for the needs of the D4 Highway project and the R7 expressway. Project description: The concessionaire of the project - Zero Bypass Limited is responsible for the construction and operation of the southern part of the Bratislava bypass. These are sections D4 -
Seriózna firma GEOSOUL s.r.o.
- 12. June 2017
- Posted by: Brano Prelovsky
- Category: Novinky
Register solventných firiem - Exkluzívna kategória serióznych firiem. Členstvo v registri solventných firiem je znamením bezpečného a korektného obchodného vzťahu s existujúcimi, ako aj potenciálnymi klientmi. Register zahŕňa spoločnosti, ktoré preukazujú svoju finančnú stabilitu, dobrú platobnú morálku, solventnosť a spoľahlivosť. Firma nemá žiadne registrované dlhy Firma nie je v insolventnom riadení, konkurze, alebo likvidácii Firma -
Project Terchová, Martinčekovci, emergency remediation of landslide
- 2. June 2017
- Posted by: Brano Prelovsky
- Category: Novinky, Uncategorized
May 2017, we designed the project of landslide remediaton in cooperation with company CAD-ECO a.s. for our client company MARUNA s.r.o. -
Implementation of the Kriváň-Lovinobaňa project, remediation of rock cuttings
- 17. May 2017
- Posted by: Brano Prelovsky
- Category: Novinky, Uncategorized
May 2017, implementation of the Kriváň-Lovinobaňa project, remediation of rock cuttings. The contractor started construction works. Construction works consist of clearing the slopes from the vegetation, removing the original damaged nettings, cleaning the rock slope from the released debris, removing the unstable blocks of smaller dimensions and then realizing of the anchors in combination with rope